WBBSE Solutions For Class 8 Maths Arithmetic Chapter 6 Time and Work

WBBSE Solutions For Class 8 Maths Arithmetic Chapter 6 Time and Work

Time and Work Introduction

Some people perform a certain amount of work in a specific time. So there are three elements connected with the problems with time and work which are

1. The number of men,

2. The amount of work and
3. The span of time.

Relation between the amount of work and the span of time

If the number of men is not altered then more time will be required if the number of work increases. Let 20 persons take 15 days to plough 10 bighas of land. We have to determine the time required to plough 20 bighas of land by those 20 persons.

Here, the number of persons is unaltered. Therefore, more time will be required if the number of work increases, and less time will be required if the amount of work decreases.

Hence, in this case

20 persons plough 10 bighas of land in 15 days

20 persons plough 1 bigha of land in 15/10 days

20 persons plough 20 bighas of land in 15/10 x 20 days

= 30 days.

WBBSE Class 8 Time and Work Notes

Relation between the number of persons and the amount of work

If the span of time remains unaltered then more work will be done if the number of persons is increased. Let in 20 days, 10 persons can plough 15 bighas of land. We have to determine the number of bighas of land that 20 persons can plough in 20 days.

Read And Learn More WBBSE Solutions For Class 8 Maths

Here the number of days is unaltered. Therefore, if the number of persons is increased the amount of work will also increase, and if the number of persons is decreased the amount of work will also decrease.

Hence, in this case, in 20 days

10 persons can plow 15 bighas of land

1 person can plough 15/10 bighas of land

20 persons can plough 15/10 x 20 bighas of land

= 30 bighas of land

Relation between the number of persons and period

If the amount of work is unaltered then less time will be required if the number of persons is increased. Let, 20 persons take 30 days to plough 20 bighas of land. We have to determine the time required by 40 persons to plow 20 bighas of land.

Here, the amount of work is unaltered. Therefore, less time will be required if the number of persons is increased and more time will be required if the number of persons is decreased.

Therefore, in this case, to plow 20 bighas of land—

20 persons take 30 days

1 persons take 30 x 20 days

40 persons take 30 x 20 / 40 days

= 15 days

Relation among many persons, amount of work, and time

From the above discussion, we see that,

1. When several persons are unaltered, the amount of work is proportional to the period.

2. When the time is unaltered, the amount of work is proportional to the number of persons.

3. When the amount of work is unaltered, the number of persons is inversely proportional to the period. We may express the above relationships with the help of the following diagram.

WBBSE Solutions For Class 8 Maths Chapter 6 Time and Work 1

Important information related to time and work

1. If a person can finish a piece of work in n days, then the work done by the person in 1 day = 1/n th part of the work.

2. If a person completes 1/n th part of a work in one day, then the time taken by the person to finish complete work = n days.

3. If A is n times as good a worker as B, then the Ratio of work done by A and B at the same time = n: 1.

4. If the number of workers to do a certain work is changed in the ratio m: n, then the ratio of time taken to finish the work changes in the ratio n: m.

5. One day’s work = 1/ Number of days required to complete the work

6. Number of days required to complete a work = 1/one day’s work

7. Number of days required to do a total work to do certain work = total work today / one day’s work.

WBBSE Solutions For Class 8 Maths Arithmetic Chapter 6 Time and Work

Some problems with time and work

Example 1

A cultivator can plough 6 bighas of land in 12 days. How many bighas of land will he plough in 36 days?

Solution :

Given:

A cultivator can plough 6 bighas of land in 12 days.

Number of days                   Measure of land

12                                             6 bighas

36                                             x bighas (say)

Since, the measure of land ploughed is directly proportional to the number of days,

∴ 12/36 = 6/x

or, 12 x x = 36 x 6

or, x = 36 x 6 / 12

= 18

18 bighas of land.

Alternative method :

In 12 days the cultivator can plough 6 bighas of land

In 1 day the cultivator can plough 6/12 bighas of land

In 36 days the cultivator can plough

6/12 x  36 bighas of land = 18 bighas of land.

Example 2

A carpenter can prepare 3 almirahs in 4 days. How many days will it take to prepare 12 almirahs?

Solution :

Given:

A carpenter can prepare 3 almirahs in 4 days.

Number of almirahs                       Number of days

3                                                            4

12                                                        x (say)

Since the number of almirahs prepared is directly proportional to the number of days.

∴ 3/12 = 4/x

or, 3x = 12 x 4

or,

x = 12 x 4 / 3

= 16

He will take 16 days.

Alternative method :

That carpenter can make,

3 almirahs in 4 days

1 almirah in 4/3 days

12 almirahs in  4/3 x 12 days

= 16 days.

16 days will it take to prepare 12 almirahs

Understanding Time and Work Problems

Example 3

6 men can do work in 30 days. In how many days will 20 men do the work?

Solution :

Given:

6 men can do work in 30 days.

Number of men             Number of days

6                                         30

20                                     x (say)

Since the number of days is inversely proportional to the number of men

∴ 20/6 = 30/x

or, 20 x x = 30 x 6

or, x = = 9

They will do the work in 9 days.

WBBSE Solutions For Class 8 School Science Long Answer Type Questions WBBSE Solutions For Class 8 School Science Short Answer Type Questions
WBBSE Solutions For Class 8 School Science Very Short Answer Type Questions WBBSE Solutions For Class 8 School Science Review Questions
WBBSE Solutions For Class 8 School Science Solved Numerical Problems WBBSE Solutions For Class 8 School Science Experiments Questions
WBBSE Solutions For Class 8 Maths WBBSE Class 8 History Notes
WBBSE Class 8 History Multiple Choice Questions WBBSE Solutions For Class 8 History
WBBSE Solutions For Class 8 Geography

 

Alternative method :

6 men can do the work in 30 days

1 man can do the work in 30 x 6 days

20 men can do the work in 30 x 6 / 20

= 9 days.

In 9 days will 20 men do the work

Example 4

A man can make 500 machine parts in 4 days working 7 hours per day. If he works for 7 days at the rate of 6 hours per day, then how many machine parts will be produced?

Solution :

Given:

A man can make 500 machine parts in 4 days working 7 hours per day. If he works for 7 days at the rate of 6 hours per day.

Total time in 4 days at the rate of 7 hours per day = (7×4) hours = 28 hours.

Total time in 7 days at the rate of 6 hours per day = (7×6) hours = 42 hours.

Total time                            Number of machine parts

28 hours                                     500

42 hours                                   x (say)

Since, the number of machine parts produced is directly proportional to the total time,

∴ 28/42 = 500/x

or, 28 x x = 500 x 42

or, x = 500 x 42 / 25

= 750

750 machine parts will be produced.

Alternative method :

That man can make

In 28 hours, 500 machine parts

In 1 hour, 500/28 machine parts

In 42 hours, 500 x42 / 28 machine parts

= 750 machine parts.

Example 5

15 people can finish work in 10 days working 8 hours per day. In how many days will 25 persons finish the work if they work 6 hours per day?

Solution :

Given:

15 people can finish work in 10 days working 8 hours per day.

Number of persons          Number of Hours       per day days

15                                             8                                    10

25                                            6                                     x (say)

Since the number of days is inversely proportional to the number of persons and is also inversely proportional to the number of hours per day, therefore,

\(\left.\begin{array}{rl}
25: 15 \\
6 & : 8
\end{array}\right\}:: 10: x\)

 

or, x 15 x 8 x 10 / 25 x 6

= 8

They will finish the work in 8 days.

Alternative method :

15 persons, working 8 hours a day can finish the work in 10 days

1 person, working 8 hours a day can finish the work in 10 x 15 days

1 person, working 1 hour a day can finish the work in 10 x 15 x 8 days

25 persons, working 1 hour a day can finish the work in 10 x 15 x 8 / 25 days

25 persons, working 6 hours a day can finish the work in 10 x 15 x 8 / 6 x 25days

= 8 days

Step-by-Step Guide to Solving Time and Work Questions

Example 6

Ram and Shyam individually can do work in 6 hours and 8 hours respectively. How long will it take to finish the work if they work together?

Solution :

Given:

Ram and Shyam individually can do work in 6 hours and 8 hours respectively.

Ram can finish the work in 6 hours.

In 1 hour Ram can do 1/6 part

Shyam can finish the work in 8 hours

In 1 hour Shyam can do 1/8 part.

Thus, in 1 hour Ram and Shyam can do (1/6 + 1/8) part

= 4+3 / 24 part

= 7/24 part

Now, Ram and Shyam can do 7/24 part of the work in 1 hour

1 part of the work in 24/7 hours = 3 3/7 hours

They will finish the work in 3 3/7 hours.

Example 7

A and B individually complete a work in 10 hours and 12 hours respectively. If they do work together then in how many hours they will complete the work ?

Solution :

Given :

A and B individually complete a work in 10 hours and 12 hours respectively.

A can finish the work in 10 hours

In 1 hour A can do 1/10 part

B can finish the work in 12 hours

In 1 hour B can do 1/12 of part

Thus, in 1 hour A and B together can do (1/10 + 1/12) part

= 6+5 / 60 part

= 11/60 part

Now, A and B can do

11/60 part of the work in 1 hour

∴  1 part of the work in 60/11 hour

= 5 5/11 hours

They will complete the work in 5 5/11 hours.

Example 8

Rahim and Karim can finish the work in 3 days. They worked together for 2 days and after 2 more days. In how many days can Karim alone finish the work?

Solution :

Given:

Rahim and Karim can finish the work in 3 days. They worked together for 2 days and after 2 more days.

In 3 days Rahim and Karim can do 1 part

In 1 day Rahim and Karim can do 1/3 part

In 2 days Rahim and Karim can do 2/3 part

After 2 days the part of the work left = (1 – 2/3)

= 1/3 and Rahim alone can do this work in 2 days.

Now, in 2 days Rahim can do 1/3 part

in 1 day Rahim can do 1/6 part

In 1 day Karim alone can do (1/3 – 1/6) part

= 2-1 / 6

= 1/6 part of the work.

∴ Karim alone can do 1/6 part of the work in 1 day

Karim alone can do 1 part of the work in 6 days

Karim alone can finish the work in 6 days.

Example 9

Ram, Shyam, and Jadu will paint the windows of a house. Ram, Shyam, and Jadu separately can complete the work in 12, 4 and 6 days. If they do the work together, then how many days they will take to complete the work?

Solution :

Given:

Ram, Shyam, and Jadu will paint the windows of a house. Ram, Shyam, and Jadu separately can complete the work in 12, 4 and 6 days

In 12 days Ram can do 1 part

In 1 day Ram can do 1/12 part

In 4 days Shyam can do 1 part

In 1 day Shyam can do 1/4 part

In 6 days Jadu can do 1 part

In 1 day Jadu can do 1/6 part

∴ Ram, Shyam, and Jadu together can do in one day = ( 1/12 + 1/4 + 1/6) part

= 1+3+2 /12 part

= 6/12 part

= 1/2 part.

∴ The three together can do 1/2 part in 1 day

∴ They together can do 1 part in 2 days

They will complete the work in 2 days

Example 10

The work of 2 men is equal to that of 4 women. 4 men and 7 women can do work in 40 days. How long will 12 men and 6 women take to finish the work?

Solution :

Given:

The work of 2 men is equal to that of 4 women. 4 men and 7 women can do work in 40 days.

Work of 2 men = work of 4 women

Work of 1 men = work of 4/2 women

= work of 2 women

∴ Work of 4 men and 7 women

= work of (8+7) women

= work of 15 women.

Again, the work of 12 men and 16 women

= work of (24+6) women

= work of 30 women

Now, 15 women can do the work in 40 days

1 woman can do the work in 40 x 15 days

3. women can do the work in 40×15 / 30 days

= 20 days

They will finish the work in 20 days.

Example 11

A and B can complete a work separately in 20 and 25 days respectively. After 10 days of their working together, they both left. C came and completed the remaining work in 3 days. If C alone would do the work, how many days he would take to complete the work?

Solution:

Given:

A and B can complete a work separately in 20 and 25 days respectively.

After 10 days of their working together, they both left. C came and completed the remaining work in 3 days.

A and B together in 1 day can do (1/20 + 1/25) part

= 5+4 / 100 part

= 9/100 part

∴ A and B together in 10 days can do = 9/100 x 10 part

= 9/10 part

∴ C does (1 – 9/10) part

= 1/10 part of the work

C can do 1/10 part in 3 days

∴ C can do 1 part in 3 x 10 days

= 30 days

C can complete the work in 30 days.

Example 12

A, B, and C individually can do a piece of work in 10 days, 12 days, and 15 days respectively. They did the work alone for 1 day individually. How much work will be left after that?

Solution :

Given:

A, B, and C individually can do a piece of work in 10 days, 12 days, and 15 days respectively. They did the work alone for 1 day individually.

In 10 days A can do 1 part

In 1 day A can do 1/10 of part

In 12 days B can do 1 part

In 1 day B can do 1/12 part

In 15 days C can do 1 part

In 1 day C can do 1/15 of part

If A, B, and C work alone for 1 day individually, then the total work performed

= (1/10 + 1/12 + 1/15) part

= (6 + 5 + 4 / 60) part

= 15/60 part

= 1/4 part

∴ Remaining work = (1-1/4) part

= 3/4 part

3/4 part of the work will be left

Practice Problems on Time and Work for Class 8

Example 13

A and B can do a piece of work in 10 days and 15 days respectively. An alone did the work for 4 days and then B alone did it for 5 days. Thereafter C did the remaining work in 8 days. How long will they take to complete the work together?

Solution :

Given:

A and B can do a piece of work in 10 days and 15 days respectively.

An alone did the work for 4 days and then B alone did it for 5 days.

Thereafter C did the remaining work in 8 days.

In 10 days A can do 1 part

In 1 day A can do 1/10 part

In 4 days A can do 4/10 of part

= 2/5 part

In 15 days B can do 1 part

In 1 day B can do 1/15 part

In 5 days B can do 5/15 part

= 1/3 part

Therefore, A and B do (2/5 + 1/3) part

= (6+5 / 15) part

= 11/15 part of the work.

∴ Remaining work = ( 1 – 11/15) part

= 4/15 part

In 8 days C can do 4/15 of part

In 1 day C can do 4/ 15 x 8 part

= 1/30 part

Hence, in 1 day A, B, and C can do ( 1/10 + 1/15 + 1/30 ) part

= (3 + 2 + 1 / 30 ) part

= 6/30 part

= 1/5 part

.’. A, B, and C together can do 1/5 part in 1 day

A, B, and C together can do 1 part in 5 days.

They will complete the work in 5 days.

Example 14

A, B, and C can do a piece of work in 10 days, 12 days, and 15 days respectively. They started the work jointly. After 3 days B became ill and went away. How long will A and C take to finish the work?

Solution :

Given:

A, B, and C can do a piece of work in 10 days, 12 days, and 15 days respectively.

They started the work jointly. After 3 days B became ill and went away.

In 1 day A, B, and C can do

(1/10 + 1/12 + 1/150part

= (6+5+4 / 40)part

= 15/60 part

= 1/4 part

∴ In 3 days A, B, and C can do 3/4 part.

∴ Remaining work = (1-3/4) part

= 1/4 part

Also, in 1 day A and C can do (1/10 + 1/15) part

= (3+2 / 30) part

= 5/30 part

= 1/6 part

Hence, A and C can do 1/6 part in 1 day

A and C can do 1 part in 6 days

A and C can do 1/4 part in 6/4 days

= 3/2

= 1 1/2 days.

A and C will do the remaining work in 1 1/2 days.

Example 15

Ram and Shyam can complete a work in 20 days, Shyam and Jadu can complete that work in 15 days, and Ram and Jadu can complete that work in 20 days. How long will they take to do the work together? If Ram, Shyam, and Jadu work individually then calculate the time that will be taken by each of them separately.

Solution :

Given:

Ram and Shyam can complete a work in 20 days, Shyam and Jadu can complete that work in 15 days, and Ram and Jadu can complete that work in 20 days.

Ram and Shyam together can do it in 1 day 1/20 part

Shyam and Jadu together can do in 1 day 1/15 part

Ram and Jadu together can do in 1 day 1/20 part

2 x (Ram + Shyam + Jadu) together can do in 1 day

= (1/20 + 1/15+ 1/20) part

= 3+4+3 / 60 part

= 10/60 part

= 1/6 part

∴ Ram, Shyam, and Jadu together can do in 1 day 1/12 part

They do 1/12 part in 1 day

They do 1 part in 12 days

Now, in 1 day, Ram can do (1/12 – 1/15) part

= 5 – 4 /60 part

= 1/60 part

Ram can do 1/60 part in 1 day

Ram can do 1 part in 60 days

In 1 day, Shyam can do (1/12 -1/12) part

= 5-3 / 60 part

= 2/60 part

= 1/30 part

Shyam can do 1/30 part in 1 day

Shyam can do 1 part in 30 days

In 1 day Jadu can do (1/12 – 1/20 )part

= 1/30 part

Jadu can do 1/30 part in 1 day

Jadu can do 1 part in 30 days

The three together will do the work in 12 days.

Ram alone in 60 days,

Shyam alone in 30 days

and Jadu alone in 30 days.

Example 16

Ram, Shyam, and Jadu individually can complete a work in 5, 6, and 10 days respectively. They started doing the work together. After 2 days Ram went away. Find in how many days Shyam and Jadu will complete the remaining work.

Solution :

Given:

Ram, Shyam, and Jadu individually can complete a work in 5, 6, and 10 days respectively. They started doing the work together.

After 2 days Ram went away.

In 1 day Ram, Shyam, and Jadu can do (1/5 + 1/6 + 1/10) part

= 6+5+3 / 30 part

= 14/30 part

= 7/15 part

∴ In 2 days Ram, Shyam, and Jadu can do the 14/15 part.

∴ Remaining work = (1 – 14/15) part

= 1 1/5 part

Shyam and Jadu can do in 1 day (1/6 + 1/10) part

= (5+3 / 30)part

= 8/30 part

= 4/15 part

Shyam and Jadu can do 4/15 part in 1 day

Shyam and Jadu can do 1 part in 15/4 days

1/15 part in 15/4 x 1/15 days

= 1/4 days

Shyam and Jadu will complete the remaining work in 1/4 day.

Example 17

Ram and Shyam can do the work individually in 10 days and 15 days respectively. At first, Ram alone worked for 4 days, then Shyam alone worked for 5 days and left. Jadu came and completed the remaining work in 4 days. If Ram, Shyam, and Jadu would work together find in how many days they would complete the work.

Solution :

Given:

Ram and Shyam can do the work individually in 10 days and 15 days respectively.

At first, Ram alone worked for 4 days, then Shyam alone worked for 5 days and left.

Jadu came and completed the remaining work in 4 days.

In 10 days Ram can do 1 part

In 1 day Ram can do 1/10 part

In 4 days Ram can do 4/10 part = 2/5 part

In 15 days Shyam can do 1 part

In 1 day Shyam can do 1/15 part

In 5 days Shyam can do 5/15 part = 1/3 part

Ram and Shyam together do (2/5 + 1/3) part

= 6+5 / 15 part

= 11/15 part

∴ Jadu does(1 – 11/15)part

= 4/15 part

In 4 days Jadu can do 4/15 part

∴ In 1 day Jadu can do 1/15 part

In 1 day Ram, Shyam, and Jadu can do (1/10 + 1/15 + 1/15) part

= (3+2+2 / 30) part

The three together can do 7/30 part in 1 day

The three together can do 1 part in 30/7 days

= 4 2/7 days

They will complete the work in 4 3/7 days.

Conceptual Questions on Applications of Time and Work

Example 18

A and B can do a piece of work in 6 days, B and C can do it in 9 days and A and C can do it in 12 days. How long will it take to do the work separately?

Solution :

Given:

A and B can do a piece of work in 6 days, B and C can do it in 9 days and A and C can do it in 12 days.

A and B together can do in 1 day 1/6 part

B and C together can do in 1 day 1/9 part

A and C together can do in 1 day 1/12 part

2 x (A, B, and C)together in 1 day do (1/6 + 1/9 +1/12) part

= 6+4+3 / 36 part

= 13/36 part

A, B, and C together in 1 day do 13/72 part = 13-8 / 72 part

= 5/72 part

∴ A does the work in 72/5 days = 14 2/5 days

In 1 day B does (13/72 – 1/12) part

= 13-6/72 part

= 7/72 part

∴ B does the work in 72/7 days = 10 2/7 days

In 1 day C does (13/72 – 1/6)part

= 13-12 /72part

= 1/72 part

C does the work in 72 days.

A will do the work in 14 2/5 days, B in 10 2/7 days, and C in 72 days.

Example 19

A and B together can do a piece of work in 20 days. They worked together for 15 days and then B went away. A finished the remaining work in 12 days. How many days would A and B take if they worked individually?

Solution:

Given:

A and B together can do a piece of work in 20 days.

They worked together for 15 days and then B went away.

A finished the remaining work in 12 days.

A and B together can do the work in 20 days

In 20 days they can do 1 part

In 1 day they can do 1/20 part

In 15 days they can do 15/20 part = 3/4 part

∴ Remaining work = (1 – 3/4) part

= 1/4 part

A can-do 1/4 part in 12 days

∴ A can do 1 part in 12 x 4 days = 48 days

B can do in 1 day(1/20 – 1/48) part

= 12-5 / 240 part

= 7/240 part

∴ B can do the work in 240/7 days = 34 2/7 days

A can do the work in 48 days and B can do the work in 34 2/7 days.

Example 20

A and B together can do a piece of work in 8 days. They worked together for 5 days and then B went away. The work was finished after 6 more days. In how many days will B alone finish the work?

Solution:

Given:

A and B together can do a piece of work in 8 days.

They worked together for 5 days and then B went away. The work was finished after 6 more days.

A and B together can do the work 8 days

In 8 days they do 1 part

In 1 day they do 1/8 part

In 5 days they do 5/8 part

∴ Remaining work = ( 1- 5/8)part

= 3/8 part

A can-do 3/8 part work in 6 days

∴ A can do 1 part work in 6 x 8/3 days

= 16 days

A and B together can do in 1 day 1/8 part

A alone can do in 1 day 1/16 part

∴ B alone can do in 1 day (1/8 – 1/16) part

= (2-1 / 16) part

= 1/16 part

∴ B alone can do the work in 16 days

B alone can do the work in 16 days

Pipes and Cisterns

A cistern or water tank has two types of pipes connected to it one which fills it up called the inlet and the other which empties it out called the outlet.

Since the nature of the work of the two pipes is exactly opposite, hence the work done by the inlet is considered positive whereas the work done by the outlet is considered negative. If an inlet fills up a cistern in n hours, then in 1 hour it will fill up 1/n th part of the cistern.

If an outlet empties a full cistern in m hours, then in 1 hour 1/m th part of the cistern will be emptied out by it.

Some problems with pipes and cisterns

Example  1

There are two pipes for taking water from the municipality water tank. The tank becomes empty in 4 hours by the two pipes separately. If both the pipes remain open calculate when the full tank will be empty.

Solution:

Given:

There are two pipes for taking water from the municipality water tank. The tank becomes empty in 4 hours by the two pipes separately.

By the two pipes in 1 hour can be emptied (1/4 + 1/4) part

= 1/2 part

∴ 1/2 part can be emptied in 1 hour

1 part

can be emptied in 2 hours

The full tank will be empty in 2 hours.

Example 2

There are three pipes in a tank. With these 3 pipes separately the tank can be filled up in 18, 21 and 24 hours respectively,

(a) If the 3 pipes remain open together find when the tank will be filled with water,

(b) If the first two pipes would remain open find the time to fill up the tank with water,

(c) If the last two pipes would remain open find the time to fill up the tank.

Solution :

Given:

There are three pipes in a tank. With these 3 pipes separately the tank can be filled up in 18, 21 and 24 hours respectively,

1. If the 3 pipes remain open together then in 1 hour (1/18 + 1/21 + 1/24) part

= 20+24+21 / 504 part

= 73/504 part is filled.

∴ 73/504 part is filled in 1 hour

1 part is filled in 504/73 hours

= 6 66/73 hours

2. If the first two pipes remain open together then in 1 hour (1/18 + 1/21)part

= 7+6 / 126 part

= 13/126 part is filled

∴ 13/126 part is filled in 1 hour

1 part is filled in 126/13 hours

= 9 9/13 hours

3. If the last two pipes remain open together then in 1 hour(1/24 +1/24) part

= 8+7 / 168 part

= 15/168 part is filled.

15/168 part is filled in 1 hour

1 part is filled in 168/15 hours

= 11 3/15 hours

= 11 1/5 hours

Examples of Time and Work Calculations

Example 3

The tank of a house can be filled up in 30 minutes by the municipality water supply pipe. All household work can be done by opening the all pipes in 4 hours. If one day the water supply pipe remains open for 25 minutes, calculate how long work can be done with that water?

Solution :

Given:

The tank of a house can be filled up in 30 minutes by the municipality water supply pipe. All household work can be done by opening the all pipes in 4 hours. If one day the water supply pipe remains open for 25 minutes.

By the water of 30 minutes, work can be done for 4 hours

By the water of 1-minute work can be done for 4/30 hours

By the water of 25 minutes, work can be done for 4/30 x 25 hours

= 10/3 hours

= 3 1/3 hours

=3 hours 20 minutes

3 hours 20 minutes work can be done.

Example 4

The first and second pipes of a tank can fill it in 8 hours and 10 hours respectively. Both the pipes remained open together for 4 hours. What part of the empty tank will be filled?

Solution :

Given:

The first and second pipes of a tank can fill it in 8 hours and 10 hours respectively. Both the pipes remained open together for 4 hours.

By the first and the second pipe, in 1 hour (1/8 + 1/10)part

= (5+4 / 40) part

= 9/40 part of the tank is filled.

∴ In 4 hours, 9/40 x 4 part

= 9/10 part of the tank is filled.

9/10 part of the tank is filled.

Example 5

A cistern can be filled by two taps A and B in 6 minutes and 3 minutes respectively. How long will it take to fill the empty cistern if the two taps are opened simultaneously?

Solution :

Given:

A cistern can be filled by two taps A and B in 6 minutes and 3 minutes respectively.

In 6 min tap A can fill 1 part of the cistern

In 1 min tap A can fill 1/6 part of the cistern

In 3 min tap B can fill 1 part of the cistern

In 1 min tap B can fill 1/3 part of the cistern

∴ In 1 minute, taps A and B can fill (1/6 + 1/3)part

= 1+2 / 6 part

= 1/2 part.

∴ Taps A and B together can fill 1/2 part of the cistern in 1 minute

1 part of the cistern in 2 minutes

The empty cistern will be filled in 2 minutes.

Example 6

A water tank may be filled in 10 minutes by a pipe. Through a hole at the bottom of the tank, the tank may be emptied in 20 minutes. Without closing the hole if the inlet pipe is opened then how long will it take to fill the empty tank?

Solution :

Given:

A water tank may be filled in 10 minutes by a pipe.

Through a hole at the bottom of the tank, the tank may be emptied in 20 minutes.

By the inlet pipe

In 10 minutes, 1 part is filled

In 1 minute, 1/10 part is filled

By the hole at the bottom of the tank

In 20 minutes, 1 part is emptied

In 2 minutes, 1/20 part is employed

Without closing the hole if the inlet pipe is opened

in 1 minute (1/10 – 1/20)part

= 1/20 part is filled.

1/20 part is filled in 1 minute

1 part is filled in 20 minutes

The empty tank will be filled in 20 minutes.

Example 7

Two taps A and B can fill a cistern in 6 minutes and 12 minutes respectively. Tap C can empty it in 8 minutes. If the three taps are opened simultaneously, then how long will it take to fill the empty cistern?

Solution :

Given:

Two taps A and B can fill a cistern in 6 minutes and 12 minutes respectively. Tap C can empty it in 8 minutes. If the three taps are opened simultaneously.

By tap A, in 1 minute, 1/6 part of the cistern is filled.

By tap B, in 1 minute, 1/12 part of the cistern is filled.

By the two taps A and B, in 1 minute, (1/6 +1/12)part

= 3/12 part

= 1/4 part of the cistern is filled.

By tap C, in 1 minute, 1/8 part of the cistern is emptied.

Therefore, if the three taps are in operation simultaneously, then in 1 minute(1/4 – 1/8)part

= 1/8 part is filled.

Therefore, 1/8 part is filled in 1 minute

1 part is filled in 8 minutes

The empty cistern will be filled in 8 minutes.

Example 8

1/4 part of a cistern is empty, and the remaining portion is filled with water. Then two taps A and B are fitted with it. The tap A can fill the cistern in 8 minutes and tap B can empty it in 4 minutes. If the two taps A and B are opened simultaneously, then how long will it take to empty the cistern ?

Solution :

Given:

1/4 part of a cistern is empty, and the remaining portion is filled with water.

Then two taps A and B are fitted with it.

The tap A can fill the cistern in 8 minutes and tap B can empty it in 4 minutes.

1/4 part of the cistern is empty.

∴ (1-1/4)part or 3/4 part is filled with water.

Now, in 1 minute tap B can empty 1/4 part and in 1 minute tap A can fill 1/8 part

∴ If taps A and B are opened simultaneously, then(1/4 – 1/8)part

= 1/8 part is emptied in 1 minute.

1/8 part is emptied in 1 minute

1 part is emptied in 8 minutes

384 part is emptied in 8 x 3/4 minutes

= 6 minutes

The cistern will be empty in 6 minutes.

Example 9

A cistern has 3 pipes A, B, and C; A and B can fill it in 3 and 4 hours respectively, and C can empty it in 1 hour. If the pipes be opened in order at 3, 4, and 5 P.M., when will the cistern be empty?

Solution :

Given:

A cistern has 3 pipes A, B, and C; A and B can fill it in 3 and 4 hours respectively, and C can empty it in 1 hour. If the pipes be opened in order at 3, 4, and 5 P.M.

In 1 hour, pipe A can fill 1/3 part, pipe B can fill 1/4 part and pipe C can empty 1 part.

Now, at 5 P.M.

when the pipe C is opened(2 x 1/3 + 1/4)part

= (2/3 + 1/4)part

= (8+3 / 12)part

= 11/112 part of the cistern is filled.

When all the three pipes are in operation, in 1 hour, (1 – 1/3 +1/4) part

= (1 – 7/12)part

= 5/12 part is emptied.

∴ 5/12 part is emptied in an hour

1 part is emptied in 12/5 hours

11/12 part in emptied in 12/5 x 11/12 hours

= 11/5 hours

= 2 hours 12 minutes

Hence, the cistern will be empty for 2 hours 12 minutes after 5 P.M.

i.e., at 7-12 P.M.

The cistern will be empty at 7-12 P.M.

Example 10

A tank has two pipes A and B. A can fill the tank with water in 8 hours and B can empty it in 12 hours. If the pipe A be opened first and the pipes be opened alternatively one at a time for 1 hour each, in how many hours will the tank be filled up ?

Solution :

Given:

A tank has two pipes A and B. A can fill the tank with water in 8 hours and B can empty it in 12 hours.

If the pipe A be opened first and the pipes be opened alternatively one at a time for 1 hour each

In the first hour, pipe A fills 1/8 part of the tank.

In the second hour, pipe A is stopped and pipe B empties 1/12 part of the tank.

Thus in every two successive hours(1/8 – 1/12)part

= (3-2 / 24) part

= 1/24 part of the tank is filled.

This process will continue until there remains a portion of the tank that can be filled by pipe A alone within 1 hour.

Thus, we have to find the time when (1- 1/8) part

= 7/8 part of the tank is filled up.

Now,

1/24 part of the tank is filled in 2 hours

1 part of the tank is filled in 2 x 24 hours

7/8 part of the tank is filled in 2 x 24 x 7/8 hours

= 42 hours

Pipe A fills the remaining | part of

the tank in 1 hour and there is no necessity of opening the second pipe after that. .’. The tank will be filled in (42 + 1) hours = 43 hours.

The tank will be filled in 43 hours.

Example 11

There are 3 pipes connected to a cistern. By these three pipes individually the cistern can be filled in 20, 12, and 15 hours respectively. When the cistern was empty the first pipe only was open for some time. After this, the first pipe was closed and the other two pipes were opened simultaneously and the remaining part was filled in 3 hours. How long was the first pipe open?

Solution :

Given:

There are 3 pipes connected to a cistern. By these three pipes individually the cistern can be filled in 20, 12, and 15 hours respectively.

When the cistern was empty the first pipe only was open for some time.

After this, the first pipe was closed and the other two pipes were opened simultaneously and the remaining part was filled in 3 hours.

By the second and the third pipe in 1 hour (1/12 + 1/15)part

= (5+4 / 60)part

= 9/60 part

= 3/20 part is filled.

By the second and the third pipe in 3 hours

3 x 3/20 part

= 9/20 part is filled.

∴ The first pipe fills(1 – 9/20) part = 11/20 part

By the first pipe, 1 part is filled in 20 hours

By the first pipe, the 11/20 part is filled in 20 x 11/20 hours = 11 hours.

The first pipe was open for 11 hours.

Leave a Comment